NICA Bulletin No7
“NICA Bulletin” No7, 2022 (PDF, 5.9 Mb)
“NICA Bulletin” No7, 2022 (PDF, 5.9 Mb)
Assembly of the MPD solenoid continues despite the objective difficulties. Unfortunately, at present, our cooperation with manufacturer ASG Superconductors has been suspended. Nevertheless, on July […]
Copyright © 2024 | Veksler and Baldin Laboratory of High Energy Physics, Joint Institute for Nuclear Research, Baldin str. 4 Dubna, RUSSIA